DMAIC: problem statement to sustained improvement
A worked example to adapt. Rename steps, add branches and owners to match how your team actually works.
Mermaid source for this diagram
flowchart TD
s(["Problem or improvement goal"])
def["Define: charter, scope and customer requirements"]
meas["Measure: baseline the current process"]
d1{"Measurement data reliable?"}
msa["Fix how the data is collected"]
an["Analyze: list and test likely root causes"]
d2{"Root cause confirmed with data?"}
more["Collect more data"]
imp["Improve: design and pilot a solution"]
d3{"Pilot meets the target?"}
ctl["Control: update procedures and monitor"]
d4{"Gain holding over time?"}
e(["Close project and hand over"])
s --> def
def --> meas
meas --> d1
d1 -->|Yes| an
d1 -->|No| msa
msa --> meas
an --> d2
d2 -->|Yes| imp
d2 -->|No| more
more --> meas
imp --> d3
d3 -->|Yes| ctl
d3 -->|No| an
ctl --> d4
d4 -->|Yes| e
d4 -->|No| impPaste into any Markdown tool that renders Mermaid, such as GitHub.
About this dmaic process flowchart
DMAIC is the five-phase problem-solving method used in Six Sigma and Lean Six Sigma projects: Define, Measure, Analyze, Improve and Control. It is meant for improving a process that already exists, where the problem is known but the cause is not.
Most DMAIC diagrams show the five phases as a straight line. In practice, projects loop back. Measurement data turns out to be unreliable, a suspected root cause does not hold up, or a pilot misses its target. This flowchart draws those checks as decisions so the team knows when a phase is really finished.
The last decision matters most. A change that looks good in the pilot can fade once the project team moves on, so the Control phase keeps monitoring until the gain holds, and only then is the process handed back to its owner.
Step by step
- Define. Write a project charter with the problem statement, the goal, the scope and what the customer needs from the process.
- Measure. Map the current process and collect baseline data on how it performs today.
- Check the data. If the measurement method is not reliable, fix it and measure again before drawing conclusions.
- Analyze. List likely causes, for example with a fishbone diagram, and test them against the data.
- Confirm the cause. If the data does not confirm a cause, go back to Measure to collect more data, then analyze again.
- Improve. Design a solution for the confirmed cause and try it in a pilot.
- Check the pilot. If the pilot misses the target, go back to the analysis.
- Control. Update procedures and training, and set up monitoring so the process stays at the new level.
- Close. When the gain holds over time, close the project and hand the process back to its owner.
How to make it in flow-chart.io
- Start from the example. Edit the text in the generator box above so it names your own DMAIC phases and gate reviews, then press Generate. The free preview needs no sign-up.
- Add the branches. Add the decision points that matter for you, for example "sponsor approves the charter?" or "benefit verified by finance?". Each decision becomes a diamond with labeled outcomes.
- Assign owners. Save the diagram to the editor (free account) and rename steps to show who does what: sponsor, project lead, process owner and team members.
- Share or export. Share a read-only view link: people with the link can view the diagram but not edit it. Downloads as PNG, SVG or PDF are part of Flow Pro (see pricing).
Tips
- Put a measurable target in the Define box, such as a defect rate or a cycle time, so the pilot decision has something to compare against.
- Many teams hold a gate review with the sponsor at the end of each phase; add one diamond per review if yours does.
- Draw the current process as its own process map during Measure; the DMAIC chart shows the project, not the process being fixed.
- If the cause is already known and the fix is obvious, a shorter problem solving flowchart may be enough.
- For a brand-new process rather than an existing one, Six Sigma practitioners usually use a design method such as DMADV instead of DMAIC.
Frequently asked questions
- What does DMAIC stand for?
- Define, Measure, Analyze, Improve and Control: the five phases of a Six Sigma improvement project.
- Is DMAIC a linear process?
- It is taught in order, but projects often loop back. Unreliable data sends you back to Measure, and a pilot that misses its target sends you back to Analyze. The flowchart shows those loops.
- What is the difference between DMAIC and PDCA?
- Both are improvement cycles. PDCA (Plan, Do, Check, Act) is a short, repeating cycle for small changes. DMAIC is a longer, data-driven project structure with a formal measurement and analysis phase.
- What tools are used in each DMAIC phase?
- Common choices are a project charter in Define, process maps and baseline data in Measure, fishbone diagrams and data analysis in Analyze, pilots in Improve, and control plans and monitoring in Control.
- Can I edit this DMAIC flowchart?
- Yes. Press Use this template to open it in the editor with a free account, then add your own gate reviews and owners.